Construction crews have temporarily shifted eastbound traffic to the westbound bridge over Simpson River. According to Santa Rosa County, the shift is expected to be in place through March 2023.
During this time, there will be two westbound lanes and one eastbound travel lane using the westbound bridge. Due to the traffic shift, there will not be dedicated bike lanes on the bridge.